Top latest Five Cost of EICR in the UK Urban news
The MCBs should be clipped on to the Din bar as well as the busbar into a present-day flowing terminal and limited screwed to give present-day into the MCBs.Two sixteen/25mm tail cables, one particular neutral and another Lively are linked to the key double pole switch of your meter. The primary earth cable ought to be screwed in to the earth block